• Fast Installation of Steel Structure Bottled Water Production Workshop Plant
  • Fast Installation of Steel Structure Bottled Water Production Workshop Plant
  • Fast Installation of Steel Structure Bottled Water Production Workshop Plant
  • Fast Installation of Steel Structure Bottled Water Production Workshop Plant
  • Fast Installation of Steel Structure Bottled Water Production Workshop Plant
  • Fast Installation of Steel Structure Bottled Water Production Workshop Plant

Fast Installation of Steel Structure Bottled Water Production Workshop Plant

Life Span: 30~50years
Design Load: Wind Speed, Snow Load, Earthquake etc
Surface: HDG/Painting
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Fast Installation of Steel Structure Bottled Water Production Workshop Plant pictures & photos
Fast Installation of Steel Structure Bottled Water Production Workshop Plant
US $29.9-69.9 / Set
Min. Order: 500 Sets
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
xgz-zp-063
Frame
H Steel
Transport Package
Seaworthy Packing
Trademark
xgz
Origin
China Qingdao
HS Code
9406900090

Packaging & Delivery

Package Size
12.00cm * 2.35cm * 2.69cm
Package Gross Weight
22000.000kg

Product Description

Fast Installation of Steel Structure Bottled Water Production Workshop Plant
Fast Installation of Steel Structure Bottled Water Production Workshop Plant
Headstream Company for fast-installed steel buildings from China
 
If you plan to start a prefabricated steel structure plant now or in the future, welcome to ask any questions for it, I will be happy to provide you with professional workshop construction suggestions and solutions 
 
Advantages of steel structure workshop:
Workshop prefabrication, quick installation, time saving, environmental protection and energy saving


Product description
Item Materials Remark
Steel Frame 1 H section column and beam Q345 steel, paint or galvanization
2 wind resistant column Q345 steel,paint or galvanization
3 Roof purline Q235B C/Z section galvanized steel
4 Wall purline Q235B C/Z section galvanized steel
  1 Tie bar Q235 round steel pipe
2 knee brace angle steel  L50*4,Q235 
3 roof horizontal bracing φ20,Q235B steel bar, paint or galvanized
4 column vertical bracing φ20,Q235B steel bar, paint or galvanized
5 purline brace Φ12 round bar Q235
6 knee brace angle steel, L50*4,Q235 
7 casing pipe φ32*2.0,Q235 steel pipe
8 gable angle steel M24 Q235B
Roof and wall
 protecting system
1 Wall and roof panel corrugated steel sheet/sandwich panel
2 self tapping screw  
3 Ridge tile color steel sheet
4 gutter color steel sheet/galvanized steel/stainless steel
5 down pipe  
6 corner trim color steel sheet
Fastener system  1  Anchor bolts Q235 steel
2 Bolts  
3 Nuts  

Preject Show We Finished
Fast Installation of Steel Structure Bottled Water Production Workshop Plant
Fast Installation of Steel Structure Bottled Water Production Workshop Plant
Fast Installation of Steel Structure Bottled Water Production Workshop Plant
Fast Installation of Steel Structure Bottled Water Production Workshop Plant

Prime info required for NEW project to customize

(*This copy of requirement is provided to get comprehensive understanding of the project, initial drawing/design phase particularly*) 

1. Location of the project _____ (country, area)
2. Project type (Private, Public, Partnership) _______
3. Size: Length*width*height _____mm*_____mm*_____mm; How many rooms___; Layers___
4. Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
5. Snow load (max. Snow height)_____kn/m2, _____mm
6. Anti-earthquake  _____level
7. Brick wall height____
8. Roof & Wall System If it's sandwich panel type, please suggest. (EPS, fiberglass, mineral wool, PU sandwich panels or other, thickness, color)  If it's singular metal steel sheet ,please suggest the thickness and color required. (RAL Number)________
9. Door quantity & size _____units, _____(width)mm*_____(height)mm Type______
10. Window quantity & size _____units, _____(width)mm*_____(height)mm Type____
11. Crane needed or not. If yes, _____units, max. Lifting weight ____tons; Max Lifting height _____m
12. Your preferred term FOB, CFR, CIF____
13. Logistic unloading port____ 

Product Show in factory
Fast Installation of Steel Structure Bottled Water Production Workshop Plant
 
FAQ
Q1. You are manufacture factory or trading company?
       A: We are manufacture factory. And you are welcomed to visit us for inspection. The quality control flow will show you our professional. Also you will enjoy the best quality and competitive price. 
Q2. Is your price competitive with other companies?
      A: Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost.
Q3. Do you offer service for installation?
      A: We will give detailed installation drawings and video for free.We have a professional construction team that can provide installation and installation abroad. And if you need, we could send engineers as installation director even a team.
Q4. Do you accept container loading inspection?
       A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5. Do you offer designing service for us?
       A:Yes, Our design team is made up of engineers with rich design experience.We could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc. we will be glad to establish sincere business cooperation with you in the near future.
Q6. What is the delivery time?
       A: Delivery time depends on order quantities. Generally, the delivery time will be 45 days after receiving deposit.
Q7. How can you get a quotation for your projects?
       A: You can chat with me anytime via Trade Manager to offer me your detail information or you can just fill out our design survey (through my email below)and send back to us. We will give you the best quotation ASAP. Thanks for your kind cooperation.


Fast Installation of Steel Structure Bottled Water Production Workshop Plant

 
Advantages
 

Faster installation

Single source responsibility

Lower cost

Flexibility in expansion

Large clear spans

Quality control

Low maintenance

Energy efficient roof and wall systems

Architectural versatility

Optimized design of steel reducing weight

Quick delivery and Quick turn-key construction.

Water-tight roofs & wall coverings

Pre-painted and has low maintenance requirement.

The building can be dismantled and relocated easily.

Clear spans up to 100m without internal columns

Flexibility in building dimensions

Fixed deadlines and costs

 

Weather-tight roof and wall coverings with accessories for long maintenance free exteriors.


Production Process
Fast Installation of Steel Structure Bottled Water Production Workshop Plant
Fast Installation of Steel Structure Bottled Water Production Workshop PlantFast Installation of Steel Structure Bottled Water Production Workshop PlantFast Installation of Steel Structure Bottled Water Production Workshop PlantFast Installation of Steel Structure Bottled Water Production Workshop PlantFast Installation of Steel Structure Bottled Water Production Workshop Plant
Our service
- We reply each inquiry within 24 hours  
- Provide one-stop service
- Develop and make new parts according to customers' requirements and detailed information.
- Customize buildings for specific applications.
- Provide service of designing, engineering, manufacturing and installation. 
- Our expert technicians can help you to assemble the project at site. 
-We have more than 23 years designing experience and producing top quality products at competitive prices
 

I would be appreciated if you can reply me to talk more details.We will make the price and design to you immediately after receiving your feedback. 


Cherry Chen
Project Manager
Qingdao Xinguangzheng Group


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Fast Installation of Steel Structure Bottled Water Production Workshop Plant pictures & photos
Fast Installation of Steel Structure Bottled Water Production Workshop Plant
US $29.9-69.9 / Set
Min. Order: 500 Sets
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001
Terms of Payment
LC, T/T