• Large-Scale Modern Intelligent Steel Structure Workshop Office Building
  • Large-Scale Modern Intelligent Steel Structure Workshop Office Building
  • Large-Scale Modern Intelligent Steel Structure Workshop Office Building
  • Large-Scale Modern Intelligent Steel Structure Workshop Office Building
  • Large-Scale Modern Intelligent Steel Structure Workshop Office Building
  • Large-Scale Modern Intelligent Steel Structure Workshop Office Building

Large-Scale Modern Intelligent Steel Structure Workshop Office Building

Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Type: Steel Building
Standard: GB
Trademark: Quality Carbon Structural Steel and Alloy Structural Steel, XGZ
Forming: Hot-Rolled Steel
Connection Form: Bolt Connection
Customization:
Diamond Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
XGZ
Member
Steel Column
Type of Steel For Building Structure
H-Section Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wallboard
Certificationteel St
ISO, CE, SGS
Customized
Customized
Design Code
Wind Load, Snow Load and Earthquake
Service Life
More Than 50 Years
Transport Package
Steel Pallet
Specification
Q235, Q345
Origin
China Qingdao
HS Code
9406900090
Production Capacity
3000 Tons/Month

Product Description

 

Large-scale Modern Intelligent Steel Structure Workshop Office Building

Product features of steel structure workshop office building:

1. The factory area is made of steel structure, which has the characteristics of short processing cycle, convenient transportation and quick installation, so that customers can put it into use in a short time and get profits in advance;

2. The workshop adopts the modern design concept, the horizontal plate plus the design of parapet, so that the appearance is simple and generous, endowed with modern atmosphere;

3. The office area adopts steel concrete structure, adding a unique modeling design, both practical at the same time, appears solemn atmosphere!
Large-Scale Modern Intelligent Steel Structure Workshop Office BuildingLarge-Scale Modern Intelligent Steel Structure Workshop Office Building

To build

Embedded parts

(Can stabilize the plant structure)

pillars

Usually H-shaped steel, or C-shaped steel (usually connected by Angle steel)

beam

C and H beams are generally used (the height of the middle layer depends on the span of the beam).

rod

They're usually C-shaped, but they're also channel steel.

watts

There are two kinds, the first is a single tile (color steel tile). The second is composite board (polystyrene, rock wool, polyurethane). (Two layers of tile between the foam to warm in winter and cool in summer, but also has the effect of sound insulation).

Construction scheme

Steel structure plant construction scheme (partial frame) content introduction

A, steel structure installation procedures

Installation of steel columns → installation of support between columns → temporary installation of steel crane beams → correction and fixing of roof beams and roof supports → installation of maintenance structures. The installation process is as follows:

Two, steel column installation

(1) Due to the large weight and length of the steel column, it is impossible to make and transport the steel column at one time, so the method of making the steel column in sections, assembling it on site as a whole and then lifting it is planned to be divided into two sections. The steel column is transported to the site in two sections: the lower lattice part and the upper H-shaped steel column. The weight of the steel column is about 6 tons, and the height of the column is about 17 meters. The lifting demand can be met by using a 50-ton truck crane, which is supplemented by a 25-ton truck crane.

(2) Single-machine rotary lifting is adopted for lifting. Before lifting, place wooden squares on the steel column footboards to avoid damage to the steel column footboards during lifting. When lifting the steel column, the crane should hook and turn the arm at the same time to make the steel column vertical off the ground and put the column into the mouth of the cup.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001
Terms of Payment
LC, T/T