• Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)
  • Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)
  • Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)
  • Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)
  • Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)
  • Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)

Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)

After-sales Service: 24 Hours
Warranty: 1 Year
Material: Steel Structure
Samples:
US$ 0/Meter 1 Meter(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018) pictures & photos
Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)
US $20-100 / Square Meter
Min. Order: 1 Square Meter
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
  • Overview
  • Product Overview
  • Product Advantages
  • Project Parameters
  • Project Exhibition
  • Packaging& Trasportation
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
BYSS-220607018
Usage
Warehouse, Villa, Dormitories, Temporary Offices, Workshop, All Kinds of Steel Building
Certification
ISO, CE
Customized
Customized
Name
All Kinds of Steel Structure Buildings
House Material
H Beam Steel, Steel Purlin
Size
Customized
Designing
Sketchup, CAD
Life Span
25-30 Years
Grade
a+
Certificates
SGS, CE, ISO
Color
Customized
Transport Package
Steel Pallet
Specification
tons
Trademark
XGZ
Origin
China
HS Code
9406900090
Production Capacity
5000 Tons Per Month

Packaging & Delivery

Package Size
1200.00cm * 230.00cm * 260.00cm
Package Gross Weight
22000.000kg

Product Description

Steel Structure Hangar Ceramic Factory Prefabricated Building
(BYSS-220607018)


Product Description

Product Overview

Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)

Product Advantages

 

ADVANTAGES FOR STEEL STRUCTURE BUILDING
1.Flexible layout
2.Good ductility, strong plasticity and deformability, high seismic resistant and wind resistant
3.Quick build and long service time
4.Light weight,high quality and low cost
5.Environmental, Material can be 100% recycled or degraded
Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)
 

Project Parameters

 

Item Details
Product name Algeria Q355B warehouse steel structure hangar ceramic factory prefabrcated building 
Construction area 3 hangar covers 9700 sq.m totally
Application Ceramic plant
Location Algeria
Frame type Portal frame
Main steel frame H steel with 2 layer of anti-rust paint
Roof& cladding 0.476mm Al-Zn sheet
Wall cladding 0.476mm Al-Zn sheet
Door Steel door, Security door
Window Aluminum alloy sliding window
Ventilating Roof ventilator
Parapet wall No
Installation On site installation for 7 months
 

Project Exhibition

 

Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)
 

Packaging& Trasportation

PACKAGING& LOADING
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.

Port

Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)


TRANSPORTATION
We have more than 10 logistics companies that have cooperated with us for many years and can apply for the most favorable transporation charage for you.

Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)

Company Profile

About Xinguangzheng
Established in 1997,Qingdao Xinguangzheng Steel Structure Co., Ltd is a large-scale professional manufacturer specializing in designing, modeling, manufacturing and installing Steel Structure Projects.

Advanced equipment, great production capacity and prompt delivery  that make us establish good relationship with more than 90 countries and regions:Canada,The United States,UAE,South Africa,Germany,France,Japan,Argentina,Venezuela and many other countries and regions. And we have participated in many significant construction projects,  such as Argentine Workshop, Australian Aircraft Hanger, Mauritius Government Projects and so on.

The company tenet of us is to "perfect itself and create wealth by taking the social development as its responsibility;the enterprise,a platform;and its team, the core of development".


Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)

SALES AND SERVICE NETWORK
XGZ have the Chinese Managing Qualification of external contractor for Construction by Chinese Ministry of Commerce, andhas cooperated with B&R countries long before. We face European and American markets and seek for international devel-opment path; our partners are from Canada, Australia, Germany, France, Brazil, England, America, etc., more than 80 coun-tries all over the world.

The group embraces the corporate mission of " social responsibility, enterprise oriented, team focused, create wealth and self improvement'

Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)

OUR ADVANTAGES & SERVICES
Pre-sale service
1.Consultant service
2.Primary design plan
3.Budget calculation

4.Draw up the contract

During-sale Service
1.Fabrication and Packing
2.Statistcal table of material
3.Delivery 
4.Submission of specific construction drawings


After-sale Service
1.Guidance and instructions for installation
2.Installation on site in needed
3.Feedback after sale
Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)


CERTIFICATE

Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)
Guangzheng is the group member unit of China Steel Structure Association; the member  of China Construction Metal Structure  Association; committee unit of China Chamber of InternationalCommerce, and is rated as Credit enterprise (class AAA) by Ministry of Commerce and SASAC of PRC. It has also been listedinto the Modern Production Base of Construction Industry in Shandong Province and has achieved the honor of famousmark of Shandong Province.

Due to its powerful technique and rich engineering experience, XGZ has achieved National Professional Contractors forsteel structure projects (class A); anti-water, anti rust and thermal insulation; architectural decoration; ProfessionalContractors for  architectural curtain wall (Class B), EN1090 Certification (CE); Global normal steel structure advanced certifi-cate (EXC-3).  XGZ has now become a high-tech, diversified and export oriented international private enterprise  integratingR&D, design,  production, installation construction and service. XGZ has joined in many constructional projects: Haier,Hisense, Sinopec, airport, subway; and has cooperated with large enterprises like CSCEC and Powerchina.


CLINETS VISIT
Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)

FAQ

1.What's the common type of the industrial building?
Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.

2.What are the payment terms?
TT and L/C are acceptable and TT will be more appreciated. 30%deposit before producing, 70% balance before loading by TT.

3.What is the delivery time?
It depends on order quantities and how complicated it is Generally speaking, the delivery time will be within 30 to 50days after deposit.

4.How to pack the products?
We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

5.How to install after the goods arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018) pictures & photos
Steel Structure Hangar Ceramic Factory Prefabricated Building (BYSS-220607018)
US $20-100 / Square Meter
Min. Order: 1 Square Meter
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001
Terms of Payment
LC, T/T