Steel Structure Workshop Low Price and Good Design
Description of steel structure workshop :
Main Parts | Item Name | Specification |
Main Steel Frame | Steel Column | Q235B, Q345B H shape, Box, Steel pipe, Hot rolled sheet |
Steel Beam | Q235B, Q345B H shape, Steel Truss, Hot rolled sheet | |
Supporting System | Brace | Q235B, Q345B Steel rod, Steel pipe, Angle steel |
Roof Purlin | C or Z shape, Steel purlin | |
Wall Purlin | Q235B, Q345B C or Z shape, Steel purlin | |
Roof | Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc., | |
Wall | Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc., | |
Accessories | Bolts | Ordinary, High strength |
Gutter | Galvanized Steel plate, Stainless steel | |
Windows | Aluminum alloy-Glass, Aluminum alloy-shutter, PVC | |
Doors | Sliding or Rolling door | |
Downpipes | PVC pipe, Color steel pipe | |
Edge Cover | Made of color steel sheet thickness 0.5mm | |
Ventilator | Stainless steel | |
Crane | Crane in 5 tons to 20 tons |
Steel structure workshop plant construction scheme (partial frame) content introduction
A, steel structure installation procedures
Installation of steel columns → installation of support between columns → temporary installation of steel crane beams → correction and fixing of roof beams and roof supports → installation of maintenance structures. The installation process is as follows:
Two, steel column installation
(1) Due to the large weight and length of the steel column, it is impossible to make and transport the steel column at one time, so the method of making the steel column in sections, assembling it on site as a whole and then lifting it is planned to be divided into two sections. The steel column is transported to the site in two sections: the lower lattice part and the upper H-shaped steel column. The weight of the steel column is about 6 tons, and the height of the column is about 17 meters. The lifting demand can be met by using a 50-ton truck crane, which is supplemented by a 25-ton truck crane.
(2) Single-machine rotary lifting is adopted for lifting. Before lifting, place wooden squares on the steel column footboards to avoid damage to the steel column footboards during lifting. When lifting the steel column, the crane should hook and turn the arm at the same time to make the steel column vertical off the ground and put the column into the mouth of the cup.
Advantages of steel structure workshop :
1. Prefabricated. Fast and easy installation, time saving and labor saving.
2. Customized design, various layout, beautiful appearances, different colors for the walls and roof.
3. light weight, easy move and cost saving.
4. Removable,convenient to assemble or disassemble. Fast construction and easy installation.
5. Environmentally, recycle, no waste produced.
6. High strength, can resistance grade 8 earthquake.
water proof, fire proof; can resists strong wind and heavy snow.
7. Long life span. can be used for more than 50 years.
8. Wide span , single or multiple spans, can have a maximum span distance in 36m without middle columns.